Berita

Cold Room Panel & Door Factory Inspection, Packing & Sea Freight Export Protection

  • Klasifikasi mereka:
  • Pandangan: ...
  • Masa pelepasan: 2026-10-31

Cold Room Panel & Door Factory Inspection, Packing & Sea Freight Export Protection

Factory inspection before shipment avoids deformed panel, foam defect and accessory shortage causing overseas installation delay. Panel inspection items: foam density test, thickness check, face sheet flatness, tongue groove dimension, seam straightness. Foam density standard: ≥38kg/m³ for wall panel; ≥42kg/m³ for floor panel to guarantee compression resistance. Each panel pastes label: serial number, dimension, position mark (wall / ceiling / floor), direction mark for assembly sequence. Xiteliduo cold room panel HS 940600 packed by PE film wrapping + corner plastic protector, loaded into container with wooden support and separation. Door leaf and sealing strip are packed separately; sealing strip wrapped by shading bag to prevent UV aging during sea transport. Glass observation window protected by hard cover; scratch and crack on glass are common transport damage. All small accessories: hinges, locks, heating wire, sealant, hangers are packed in separate box with BOM list. Container loading: panels placed vertical, not stacked flat; flat stacking leads to permanent bending deformation of long panel. Refrigeration exporter matches label drawing and panel serial number; sorting by installation sequence reduces on-site sorting time.

FAQ

  1. What is the qualified PU foam density for cold room wall panel? ≥38 kg/m³.
  2. What is the qualified PU foam density for cold room floor panel? ≥42 kg/m³.
  3. How to mark each panel for easy installation? Serial number, size, installation position and direction mark.
  4. How should long PU panels be placed inside container? Vertical placement, forbid flat stacking.
  5. Why sealing strip packed separately with shading package? Prevent UV aging during long sea transportation.
  6. What protection for door observation tempered glass? Hard protective cover to avoid collision crack.
  7. What documents are shipped together with panel package? Layout drawing, assembly instruction and BOM accessory list.
  8. What is the most common panel damage during sea freight? Long panel bending deformation and corner collision dent.
Laman sesawang artikel ini: https://ms.xtldcool.com/news/855.html

Dapatkan pelan pengubahsuaian produk dalam talian

Sila isi butiran anda dalam kotak di bawah, dan anda akan dapat memperolehinya secara percuma.

Talian Perunding

+86-18157593311

Xiteliduo & Chuanli

Pabrik Sumber China Kompresor Piston Semi-Hermetik R32 & Sistem Penyejukan Perindustrian Turnkey Tersuai. Kompresor dibangunkan sendiri + penyelesaian penyejukan lengkap, prestasi stabil untuk keadaan kerja tropika & suhu ultra-rendah.

hubungi kami

Perkhidmatan Teknikal: +86-575-83665888;83068555 
Hotline Pemampat: +86-18157593311 
Hotline Tiub Pemanasan Elektrik: +86-13857577938 
Email: helenliu1983xtld@gmail.com 
Kilang Tiub Pemanasan Elektrik: No. 150, Kampung Donghu, Bandar Ganlin, Bandar Shengzhou, Bandar Shaoxing 
Kilang Pemampat: No. 679, Zon Pembangunan Ekonomi Dongguo, Bandar Shengzhou, Bandar Shaoxing

Hak Cipta © 2026 Zhejiang Xitelidu Environmental Technology Co., Ltd. & Shengchuanli Environmental Technology Co., Ltd. Semua Hak Terpelihara.